Chapter 10: Powering On the Chassis
204
Section II: Installing the Chassis
3. Use an 8 mm wrench to remove the grounding post nut and washer,
shown in Figure 126, from the power supply.
Figure 126. Removing the Nut and Washer from the Grounding Post
4. Attach the grounding lug and wire to the grounding post and secure
them with the nut and washer removed in the previous step, and an 8
mm wrench.
Review the following before installing the grounding wire:
You should angle the wire to the right so that you can open the
plastic window to access the positive and negative terminals on the
terminal block.
You may route the cable either above or below the locking handle.
Allied Telesis recommends tightening the nut and washer to 26
inch-lbs.
The grounding wire is illustrated in Figure 127 on page 205.
Grounding
post
Содержание AT-SB*81CFC960
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Страница 96: ...96...
Страница 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Страница 166: ...Chapter 7 Installing the AT SBx81CFC960 Controller and Ethernet Line Cards 166 Section II Installing the Chassis...
Страница 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Страница 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Страница 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Страница 300: ...300...
Страница 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...
Страница 356: ...Appendix A Technical Specifications 356...