255
Chapter 13
Replacing Modules
This chapter contains procedures on how to replace modules in the unit.
The chapter contains the following sections:
“Replacing the AT-SBxPWRSYS1, AT-SBxPWRSYS2, or AT-
SBxPWRPOE1 Power Supply” on page 256
“Replacing the AT-SBxPWRSYS1 DC Power Supply” on page 262
“Replacing Ethernet Line Cards” on page 274
“Replacing Expansion Modules in AT-SBx81XLEM Line Cards” on
page 276
“Replacing the AT-SBx81CFC960 Controller Fabric Card” on page 282
Содержание AT-SB*81CFC960
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Страница 96: ...96...
Страница 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Страница 166: ...Chapter 7 Installing the AT SBx81CFC960 Controller and Ethernet Line Cards 166 Section II Installing the Chassis...
Страница 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Страница 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Страница 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Страница 300: ...300...
Страница 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...
Страница 356: ...Appendix A Technical Specifications 356...