SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
249
Fiber Optic or Twisted Pair Transceivers
This section applies to Ethernet line cards and expansion modules with
transceiver slots.
The L/A LEDs on the transceiver slots are solid or flashing green when
transceivers have links to end nodes. If a transceiver is cabled to an end
node but the L/A LED is off, try the following:
If all the L/A LEDs on the line cards in the chassis are off, try
pressing the eco-friendly button on the active master controller
card to turn on the LEDs.
Check that the transceiver is firmly inserted into the slot on the line
card.
Check that both ends of the cable are securely connected to the
ports on the transceiver and end node.
Verify that the end node is powered on and operating properly.
Try replacing the cable.
Here are additional steps for fiber optic transceivers:
Review the operating specifications of the transceiver and end
node to verify that the devices have the same speed and duplex
mode.
Check that the operating specifications, including wavelength and
maximum operating distance, of the transceiver are compatible
with the fiber optic port on the end node.
Make sure that you are using the appropriate type of fiber optic
cable and that the cable length does not exceed the allowed
maximum distance. The cable specifications for the transceivers
are provided in the installation instructions that ship with the
modules.
Use a fiber optic tester to test the whether the optical signal is too
weak (i.e., sensitivity) or too strong (i.e., maximum input power).
The operating specifications of the fiber optic transceivers are
shipped with the units.
Check the two strands of the fiber optic cable to be sure that the
receive fiber connector is connected to the transmit connector on
the remote end node, and that the transmit fiber connector is
connected to the receive connector on the end node.
Содержание AT-SB*81CFC960
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Страница 96: ...96...
Страница 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Страница 166: ...Chapter 7 Installing the AT SBx81CFC960 Controller and Ethernet Line Cards 166 Section II Installing the Chassis...
Страница 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Страница 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Страница 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Страница 300: ...300...
Страница 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...
Страница 356: ...Appendix A Technical Specifications 356...