Chapter 13: Replacing Modules
256
Section II: Installing the Chassis
Replacing the AT-SBxPWRSYS1, AT-SBxPWRSYS2, or AT-
SBxPWRPOE1 Power Supply
This section contains the procedure for removing or replacing the AT-
SBxPWRSYS1, AT-SBxPWRSYS2, or AT-SBxPWRPOE1 Power Supply
in the AT-SBx8106 Chassis.
Note
The illustrations in the following procedure show the AT-
SBxPWRSYS1 AC Power Supply. The procedure is the same for all
power supply slots.
Note
Allied Telesis recommends generating a backup copy of the
configuration file in the controller card before removing or replacing
a power supply. For instructions, refer to the
Software Reference for
SwitchBlade x8100 Series Switches
on the Allied Telesis web site.
Note
The power supplies are hot swappable.
Caution
When installing the AT-SBxPWRSYS2 Power Supply in an active,
operational chassis, you should connect the AC power cord to the
chassis before installing the power supply. Attaching the power cord
after installing the AT-SBxPWRSYS2 Power Supply might cause the
active master controller card to restart its operating system. This can
result in a temporary interruption of network operations of the
chassis if it has only one controller card. This guideline does not
apply to the AT-SBxPWRSYS1 AC or DC Power Supply or AT-
SBxPWRPOE1 Power Supply.
To remove power supplies from the chassis, perform the following
procedure:
1. Disconnect the AC power cord for the power supply from the AC
power source and the corresponding AC socket on the back panel of
the chassis. The figure in Figure 156 on page 257 shows the removal
of the power cord from connector D, which corresponds to slot D on
the front panel.
Содержание AT-SB*81CFC960
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Страница 96: ...96...
Страница 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Страница 166: ...Chapter 7 Installing the AT SBx81CFC960 Controller and Ethernet Line Cards 166 Section II Installing the Chassis...
Страница 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Страница 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Страница 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Страница 300: ...300...
Страница 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...
Страница 356: ...Appendix A Technical Specifications 356...