SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
131
Installing AT-SBxPWRPOE1 PoE Power Supplies
This section contains the installation procedure for the AT-SBxPWRPOE1
Power Supply. The module provides the power for the PoE+ ports on the
AT-SBx81GP24 PoE Line Card. For background information, refer to
“Power Supplies and Power Supply Slots” on page 26.
Warning
The electronic components in the power supply can be damaged by
electro-static discharges (ESD). Follow the procedure in “Protecting
Against Electrostatic Discharge (ESD)” on page 124 to guard
against ESD damage when unpacking and installing the power
supply.
To install the power supply, perform the following procedure:
1. Choose a slot for the AT-SBxPWRPOE1 System Power Supply in the
chassis.
You may install it in either slot A or B, shown in Figure 51 on page 126.
2. Raise the handle on the blank panel covering the selected slot and
slide the panel from the chassis. Figure 57 on page 132 shows the
blank panel being removed from slot A.
Содержание AT-SB*81CFC960
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Страница 96: ...96...
Страница 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Страница 166: ...Chapter 7 Installing the AT SBx81CFC960 Controller and Ethernet Line Cards 166 Section II Installing the Chassis...
Страница 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Страница 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Страница 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Страница 300: ...300...
Страница 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...
Страница 356: ...Appendix A Technical Specifications 356...