ACE-3105, ACE-3205 Ver. 5.2
Turning On the Unit
3-1
Chapter
3
Operation
This chapter describes the following:
•
Powering ACE-3105, ACE-3205 on and off
•
Description of the ACE-3105, ACE-3205 front panel LED indicators and their
function
•
Default settings
•
Configuration alternatives – the different management access options
available for ACE-3105, ACE-3205
•
Menu navigation.
For a detailed explanation of the options and parameters in the management
menus, see
3.1
Turning On the Unit
³
To turn the ACE-3105, ACE-3205 unit on:
•
Connect the unit's power cable(s) to the mains.
The power supply indicator lights up and remains lit as long as ACE-3105,
ACE-3205 receives power.
Once turned on, ACE-3105, ACE-3205 requires no operator attention, with the
exception of occasional monitoring of front panel indicators. Intervention is
required only when:
•
ACE-3105, ACE-3205 must be configured to its operational requirements
•
The alarm LED indicator indicates an alarm
•
Diagnostic tests are performed.
Содержание ACE-3205
Страница 1: ...ACE 3105 ACE 3205 Cell Site Gateways Version 5 2 INSTALLATION AND OPERATION MANUAL The Access Company...
Страница 2: ......
Страница 352: ...Chapter 6 Monitoring and Diagnostics Installation and Operation Manual 6 114 Technical Support ACE 3105 ACE 3205 Ver 5 2...
Страница 380: ...Appendix D Clock Modes Installation and Operation Manual D 8 DSL and PSN Timing Modes ACE 3105 ACE 3205 Ver 5 2...
Страница 396: ...Appendix E Encapsulation over PSN Installation and Operation Manual E 16 5BClock Encapsulation ACE 3105 ACE 3205 Ver 5 2...
Страница 414: ......
Страница 416: ......
Страница 417: ......