Appendix
C ATM OAM Functionality
Installation and Operation Manual
C-10
OAM Modes of Operation over ATM
ACE-3105, ACE-3205 Ver. 5.2
VC End-to-End Point
When a VC connection point is set as an endpoint (end-to-end), it operates as
follows:
•
F4 and F5 segment and end-to-end OAM cells are dropped from the cell
stream. F5 end-to-end AIS, RDI and CC cells are monitored.
Figure
C-25. VC Endpoint – Case A
•
When F5 end-to-end AIS cells are received, AIS state is declared and F5
end-to-end RDI cells are generated towards the backward direction.
Figure
C-26. VC Endpoint – Case B
•
When a failure is detected on the physical port, AIS state is declared and F5
end-to-end RDI cells are generated towards the backward direction.
Figure
C-27. VC Endpoint – Case C
•
When a VC endpoint is set as a CC source point, F5 end-to-end CC cells are
generated towards the backward direction every second.
Содержание ACE-3205
Страница 1: ...ACE 3105 ACE 3205 Cell Site Gateways Version 5 2 INSTALLATION AND OPERATION MANUAL The Access Company...
Страница 2: ......
Страница 352: ...Chapter 6 Monitoring and Diagnostics Installation and Operation Manual 6 114 Technical Support ACE 3105 ACE 3205 Ver 5 2...
Страница 380: ...Appendix D Clock Modes Installation and Operation Manual D 8 DSL and PSN Timing Modes ACE 3105 ACE 3205 Ver 5 2...
Страница 396: ...Appendix E Encapsulation over PSN Installation and Operation Manual E 16 5BClock Encapsulation ACE 3105 ACE 3205 Ver 5 2...
Страница 414: ......
Страница 416: ......
Страница 417: ......