![ABB relion REF615 Скачать руководство пользователя страница 97](http://html.mh-extra.com/html/abb/relion-ref615/relion-ref615_applications-manual_2824097.webp)
NOT
IN
OUT
AND6
B1
B2
B3
B4
B5
B6
O
NOT
IN
OUT
NOT
IN
OUT
TRPPTRC2_TRIP
CBXCBR1_ENA_CLOSE
TRPPTRC1_TRIP
X110_BI3_GAS_PRESSURE_ALARM
DCSXSWI1_OKPOS
ESSXSWI1_OPENPOS
X110_BI4_CB_SPRING_CHARGED
GUID-3C981DB3-EFC0-490C-AE96-2C5B16CC7E00 V1 EN
Figure 82:
Circuit breaker close enable logic
The configuration includes logic for generating circuit breaker external closing and
opening command with the IED in local or remote mode.
Check the logic for the external circuit breaker closing command and
modify it according to the application.
Connect additional signals for opening and closing of circuit breaker
in local or remote mode, if applicable for the configuration.
AND
B1
B2
O
AND
B1
B2
O
OR
B1
B2
O
FALSE
FALSE
CBXBCR1_AU_OPEN
CONTROL_LOCAL
CONTROL_REMOTE
GUID-73713DC3-F7C8-4821-AF9D-2A7568AFE963 V1 EN
Figure 83:
External opening command for circuit breaker
AND
B1
B2
O
AND
B1
B2
O
OR
B1
B2
O
FALSE
FALSE
CBXCBR1_AU_CLOSE
CONTROL_LOCAL
CONTROL_REMOTE
GUID-5BED9700-F389-4A3E-AE41-6854954D5819 V1 EN
Figure 84:
External closing command for circuit breaker
3.4.3.5
Functional diagrams for measurement functions
The phase current inputs to the IED are measured by the three-phase current
measurement function CMMXU1. The current input is connected to the X120 card in
the back panel. Similarly, sequence current measurement CSMSQI1 measures the
sequence current and the residual current measurement RESCMMXU1 measures the
residual current.
1MRS756378 S
Section 3
REF615 standard configurations
REF615
91
Application Manual
Содержание relion REF615
Страница 1: ...Relion 615 series Feeder Protection and Control REF615 Application Manual ...
Страница 2: ......
Страница 22: ...16 ...
Страница 398: ...392 ...
Страница 402: ...396 ...
Страница 403: ...397 ...