ACH550 E-Clipse Bypass User’s Manual
2-139
Embedded fieldbus
Bypass overview
The FLN fieldbus connection to the ABB E-Clipse bypass is based on an industry
standard EIA 485 physical interface. The FLN (Floor Level Network) Fieldbus
protocol is a serial communication protocol, used by the Siemens APOGEE®
system. The ABB E-Clipse bypass interface is specified in Siemens application
2737.
Supported features
The ABB E-Clipse bypass supports all required FLN features.
Reports
The ABB E-Clipse bypass provides seven pre-defined reports. Using a report
request generated from the FLN fieldbus controller, select one of the following sets
of points. By providing views of selected points, these reports are often easier to
work with than views of the full point database.
94
RESET FAULT
Command by FLN to reset a faulted drive
(1 = RESET, 0 = NO).
Parameter 1604 must be set to COMM for FLN to control this
state.
The control input is rising-edge sensitive, so, once the
command is issued, this point automatically returns to its
inactive state. This “momentary” operation avoids any need
for an explicit command to clear the point before a
subsequent reset can be issued.
95
MBOX PARAM
Sets the parameter to be used by the mailbox function.
96
MBOX DATA
Sets or indicates the data value of the mailbox function.
97
MBOX READ
Command by FLN to read the parameter value specified by
Point 95, MBOX PARAM. The parameter value is returned in
Point 96, MBOX DATA.
The control input is rising-edge sensitive, so, once the
command is issued, this point automatically returns to its
inactive state. This “momentary” operation avoids any need
for an explicit command to clear the point before a
subsequent reset can be issued.
98
MBOX WRITE
Command by FLN to write the data value specified by Point
96, MBOX DATA, to the parameter value specified by Point
95, MBOX PARAM.
The control input is rising-edge sensitive, so, once the
command is issued, this point automatically returns to its
inactive state. This “momentary” operation avoids any need
for an explicit command to clear the point before a
subsequent reset can be issued.
99
ERROR STATUS 1 of the 5 mandatory FLN points required for compatibility
with Siemens control systems. It has no functionality in the
drive application.
None
FLN Detailed Point Descriptions
Point
Description
Drive
Parameter
Содержание ACH550-BCR
Страница 4: ...iv Manual contents ...
Страница 5: ...ACH550 UH User s Manual 1 1 ACH550 UH HVAC Drives 1 550 HP User s Manual 2016 ABB All Rights Reserved ...
Страница 6: ......
Страница 12: ...1 8 ACH550 UH User s Manual Table of contents ...
Страница 36: ...1 32 ACH550 UH User s Manual Installation ...
Страница 70: ...1 66 ACH550 UH User s Manual Application macros ...
Страница 335: ...ACH550 UH User s Manual 1 331 Technical data ...
Страница 348: ......
Страница 382: ...2 36 ACH550 E Clipse Bypass User s Manual Start up ...
Страница 398: ...2 52 ACH550 E Clipse Bypass User s Manual Bypass functions overview ...
Страница 406: ...2 60 ACH550 E Clipse Bypass User s Manual Application macros ...
Страница 544: ...2 198 ACH550 E Clipse Bypass User s Manual Embedded fieldbus ...
Страница 584: ...2 238 ACH550 E Clipse Bypass User s Manual Diagnostics ...
Страница 608: ......
Страница 612: ...3 6 ACH550 UH User s Manual Table of contents ...
Страница 622: ...3 16 ACH550 PCR PDR User s Manual Installation ...
Страница 641: ......