1-3
IM 704210-01E
Functions
1
1.3 Measurement Functions (Measurement Items)
Period
≡
For operating procedure, refer to 5.2
≡
The time from a rising (or falling) edge to the next rising (or falling) edge of the input signal is
measured. Either rising or falling edge can be selected, and channel A or B can be selected for
measurement.
Measured
Measured
Measured
CH A/
CH B
Example (rising slope is selected)
Time Interval
≡
For operating procedure, refer to 5.3
≡
The time interval between the signal input to channel A and that input to channel B is measured.
The following two types of time interval can be measured.
A-to-B interval
The time interval between an edge of the signal input to channel A and the first edge of the signal
input to channel B is measured. Various combinations of edges can be selected as follows. For a
description of combinations of slopes, refer to 5.3, “Setting Time Interval Measurement”.
Measured
Measured
CH A
CH B
Example (Both channels A and B: rise)
Measured Measured Measured
CH A
CH B
A
B
A
B
Example (Channel A: both rise and fall, channel B: rise)
A-to-B-to-A interval
The time interval between an edge of the signal input to channel A and the first edge of the signal
input to channel B, and the time interval between an edge of the signal input to channel B and the
subsequent edge of the signal input to channel A are measured. For a description of combinations
of slopes, refer to 5.3, “Setting Time Interval Measurement”.
Measured
Measured
Measured
Measured
CH A
CH B
A B A
Example (All three edges: rise)