4. Put up crane before operation
a. During the crane operation, all the tires should be completely off the ground.
b. The horizontal outrigger must depend on working conditions in the rated crane weight table to
extend out, if only extend out the lifting lateral outrigger may lead to the following dangers:
1)The force of weight through the rope passes to the main crane boom, auxiliary arm and other
parts, and if the sudden unloading or wire rope fracture happen, the force plus on the crane arm head
suddenly released will cause the crane rearward tilting;
2)Turning the heavy weight to the outrigger not fully extended side leads to crane overturning;
3)Rearward tilting due to the crane arm and counterweight actions.
●
The horizontal outrigger must extend to the specified value in rated crane weight table
that can just surpport the crane;
●
After the horizontal outrigger stretched out, it must be locked with pin, that is, the outrigger pin
must be fully inserted to prevent the outriggers retracting and causing tilting;
4-3-2 Obstacles around crane
Crane operation should consider obstacles around it, such as nearby buildings, other cranes, vehicles or
loading and unloading of vessels, ongoing stacking goods and public traf
fi
c area including highway, railway
and river.
One should not neglect risks of facilities to or from the underground such as gas pipeline or cable.
Measures should be taken to make the crane avoid any underground facilities, if not, protection steps should
be taken to underground facilities and prevent accidents happening.
Crane or its lifting load pass through the obstacles place, one should observe the following conditions:
a. When the field conditions permits, the crane machine running route should be clearly marked to
make it away from the obstacle. There is adequate clearance between any components of the crane machine
and the obstacles. If unable to reach the required clearance requirements, effective measures should be taken
to prevent any risks of barrier or being jammed.
b. The place where periodically stacking the crane machine accessories goods should be long-term
marked its boundary line on the ground.
1. Overhead wire and cable
When the crane operation in close proximity of the overhead cable, the assignment personnel, the
operator and other
fi
led personnel should pay attention to the following points:
a. When working in unfamiliar areas, check whether there is the overhead line or not;
b. Con
fi
rm all overhead cable line whether they are electri
fi
ed or not;
c. The occasion maybe contact with the electric power line, before starting work, one should at
fi
rst
consider the opinions of the local electric power administrative department;
d. During the crane operation, arm frame, lifting appliance, auxiliary devices, steel wire rope, and the
load, the minimum distance from transmission line should be in accordance with the regulations in table 4-2.
Construction instructions
Chapter 4
Summary of Contents for XCT80
Page 1: ...Courtesy of CraneMarket com...
Page 10: ...XCT80 Truck Crane Operation Manual VIII Courtesy of CraneMarket com...
Page 14: ...XCT80 Truck Crane Operation Manual 1 2 LOG Chapter 1 Courtesy of CraneMarket com...
Page 20: ...XCT80 Truck Crane Operation Manual 2 6 LOG Chapter 2 Courtesy of CraneMarket com...
Page 31: ...XCT80 Truck Crane Operation Manual 3 11 LOG Chapter 3 Courtesy of CraneMarket com...
Page 32: ...XCT80 Truck Crane Operation Manual 3 12 LOG Chapter 3 Courtesy of CraneMarket com...
Page 47: ...XCT80 Truck Crane Operation Manual 4 15 LOG Chapter 4 Courtesy of CraneMarket com...
Page 48: ...XCT80 Truck Crane Operation Manual 4 16 LOG Chapter 4 Courtesy of CraneMarket com...
Page 80: ...XCT80 Truck Crane Operation Manual 5 32 LOG Chapter 5 Courtesy of CraneMarket com...
Page 104: ...XCT80 Truck Crane Operation Manual 6 24 LOG Chapter 6 Courtesy of CraneMarket com...
Page 124: ...XCT80 Truck Crane Operation Manual 7 20 LOG Chapter 7 Courtesy of CraneMarket com...
Page 142: ...XCT80 Truck Crane Operation Manual 8 18 LOG Chapter 8 Courtesy of CraneMarket com...
Page 176: ...XCT80 Truck Crane Operation Manual 9 34 LOG Chapter 9 Courtesy of CraneMarket com...
Page 206: ...XCT80 Truck Crane Operation Manual 10 30 LOG Chapter 10 Courtesy of CraneMarket com...
Page 215: ...XCT80 Truck Crane Operation Manual 11 9 LOG Chapter 11 Courtesy of CraneMarket com...
Page 216: ...XCT80 Truck Crane Operation Manual 11 10 LOG Chapter 11 Courtesy of CraneMarket com...
Page 235: ...XCT80 Truck Crane Operation Manual 12 19 LOG Chapter 12 Courtesy of CraneMarket com...
Page 236: ...XCT80 Truck Crane Operation Manual 12 20 LOG Chapter 12 Courtesy of CraneMarket com...
Page 241: ...XCT80 Truck Crane Operation Manual 13 5 LOG Chapter 13 Courtesy of CraneMarket com...
Page 242: ...XCT80 Truck Crane Operation Manual 13 6 LOG Chapter 13 Courtesy of CraneMarket com...
Page 244: ...XCT80 Truck Crane Operation Manual 14 2 14 1 Appendix Chapter 14 Courtesy of CraneMarket com...
Page 249: ...XCT80 Truck Crane Operation Manual 14 7 LOG Chapter 14 Courtesy of CraneMarket com...
Page 250: ...Powered by TCPDF www tcpdf org Courtesy of CraneMarket com...