3. The roof-line for internally mounted masts or the support bracket for externally mounted
masts must lie between the weep hole and base tube collar. Mounting hardware should be at
least 1 inch (25 mm) above the weep hole and 3 inches (76 mm) below the collar. The
support bracket or roof mounting kit should be as high as possible on the mast and not block
the weep hole. In an internal mount application, the drain kit provided with the mast can
redirect the water exiting the weep hole.
4. The areas beneath the floor must be free of obstructions to allow for accessibility to base
plate fasteners and air inlet port.
5. The installed elevation of the bottom collar of the mast (this is where moving parts are
located) must be at least 2.7 meters (8.8 feet) above ground level to prevent reach of upper
extremities during operation. Alternatively, lower elevations are permitted if the mast is
properly guarded by the installer, or if the mast is offset towards the middle of the roof with
reach limited by vehicle structure to prevent contact with the mast during operation.
5.1.1
Dimensions
Refer to the drawings that ship with the mast for detailed information on the size of the system.
Additional room may be required for optional components such as a camera, strobe light, or D-
TEC Power Line Detection System.