PAGE 61 OF 126
NIGHT SCAN VERTICAL, VERTICAL COMPLETE, AND VERTICAL HDT
OPERATING INSTRUCTIONS
TP-4836201-H
MAY 2021
5.10 Electrical Installation Detail
Ensure the source power for the mast and lights is not connected or turned off before wiring the
system following proper lock-out tag-out procedures. See Figure 3-11, Figure 3-12, Figure 3-13,
and Figure 5-16 for information on where the cables run into the control box. There is a bushing
provided if the cable outer diameter does not match the cable grip diameter to install if needed.
Refer to the wiring diagrams contained in the Appendix section. Be sure to follow the
recommended torque requirements found in the wiring diagram. Remove the screws on the
control box lid and open the lid to expose the base board mounted to the back of the lid.
Note: The Night Scan Vertical HDT comes pre-wired internally from the factory. During
installation, electrically connect the other ends of the following:
• Solenoid Power
• DC Board Power
• DC Light Power Input
• Bulkhead Control Cable
See drawing WD-47621 in the Appendix Section for more information on how to electrically
install the Night Scan Vertical HDT.
Summary of Contents for Night Scan Vertical 4.3-15
Page 2: ......