PAGE 57 OF 126
NIGHT SCAN VERTICAL, VERTICAL COMPLETE, AND VERTICAL HDT
OPERATING INSTRUCTIONS
TP-4836201-H
MAY 2021
5.8.1
Attaching the Power Converter
Note: The Power Converter is standard with the Night Scan Vertical HDT, but it is optional for the
Night Scan Vertical and Night Scan Vertical Complete.
Mount the power converter vertically (fins up and down) for better heat dissipation (Figure 5-22).
The best practice is to mount the power converter in a fan-cooled enclosure. Do not mount the
power converter in the engine compartment or an enclosed space without ventilation.
Figure 5-22 Power Converter Mounting
5.9 Installing Remote Control
This section provides information to install the remote control. Several options are available.
Follow the instructions appropriate for your system.
5.9.1
Wired Hand-Held Remote Control (HHRC)
Go to section 5.9.2 to if you are installing the Panel Mount Remote Control (PMRC) or section
5.9.3 for the wireless control option. This section describes how to install the Wired HHRC with a
bulkhead.
The bulkhead connector is provided to remotely install the connection point for the HHRC at the
operator control location. The operator station should be located where the operator has line-of-
sight to the mast operating space. The bulkhead and HHRC should be located in a protected, dry
location (the HHRC is IP54).
Fins
Mounting Power
Converter with Fins
Running Up and
Down as Shown
Summary of Contents for Night Scan Vertical 4.3-15
Page 2: ......