PAGE 21 OF 126
NIGHT SCAN VERTICAL, VERTICAL COMPLETE, AND VERTICAL HDT
OPERATING INSTRUCTIONS
TP-4836201-H
MAY 2021
Control Box:
The control box (Figure 3-11, Figure 3-12, Figure 3-13) contains the base board
for the system, and the solenoid valve assembly. This is where power and air supply are
connected.
Figure 3-11 Night Scan Vertical Control Box
Figure 3-12 Night Scan Vertical Complete Control Box Setups
Base Board Air Control Valve Assembly
To Mast
HHRC
DC
Control
Light
Power In
Air to
Mast
Coil Cord
Power In
Coil Cord In
Magnetic
Switches In
DC AC HHRC Control AC Cable In Coil Cord and
Cable In
Cable In Cable In Magnetic Switches In
Base Board HHRC Control Base Board
Cable In
DC Cable
In
Control Box Underneath Mast Control Box Beside Mast
Summary of Contents for Night Scan Vertical 4.3-15
Page 2: ......