PAGE 48 OF 126
NIGHT SCAN VERTICAL, VERTICAL COMPLETE, AND VERTICAL HDT
OPERATING INSTRUCTIONS
TP-4836201-H
MAY 2021
5.5 Attaching the Control Box
5.5.1
Night Scan Vertical
The control box may be surface mounted using four M6 or 1/4 inch screws, nuts, and lock
washers provided by the installer. To install the control box:
1. Disconnect any attached cables before installation.
2. Open the cover and mount the unit through the four clearance holes located on the rear side
of the control box (Figure 5-14).
3. Attach the bolts, lock washers and nuts to secure the unit. The recommended installation
torque for an M6 or 1/4 inch stainless steel fastener is 7-8 Nm (60-72 in.-lb.). It is
recommended to use low strength thread-locking compound.
4. Reconnect any cables and replace the cover. Be sure to secure the green ground wire
provided on the bulkhead to vehicle ground.
Figure 5-14 Night Scan Vertical Control Box Mounting Hole Locations
5.5.2
Night Scan Vertical Complete
See Section 5.4.2 to see how to attach the Night Scan Vertical Complete control box.
Summary of Contents for Night Scan Vertical 4.3-15
Page 2: ......