2-6
4.
Install the front cover by placing the top of
the front cover onto the metal flange at the
top of the chassis. Rotate the front cover
into place. Insert the thumbscrews (pro-
vided) into the slots located at the bottom
back corners of the front cover. Tighten to
secure the cover.
NOTE:
If the unit has been placed in such
a way that there is no room to insert the
thumbscrews from the bottom, a side
mounting kit may be used.
MAKE ELECTRICAL CONNECTIONS
IMPORTANT:
The installation of field wiring
must conform to the requirements of the Na-
tional Electrical Code, ANSI/NFPA NO. 70 (lat-
est edition) in the United States, and any state
laws and local ordinances (including plumbing
or wastewater codes). In Canada, field wiring
must conform to the Canadian electrical code
PART I, CSA STANDARD C22.1-1993 or cur-
rent edition. Local authorities having jurisdic-
tion should be consulted before installation is
made. Such applicable regulations or require-
ments take precedence over the general in-
structions in this Job Aid.
INSTALL THE CHASSIS
1.
Disconnect power.
2.
Center the chassis in the installed sleeve
and carefully push the chassis until the
chassis flange and gasket contact the
sleeve flange.
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before
operating.
Failure to do so can result in death or
electrical shock.
3.
Locate the 4 - #10 x 1
″
chassis mounting
screws (provided). Tighten the screws into
the wall sleeve screw clips.
1. Wall sleeve
2. Chassis flange and gasket
1
2
1. Chassis mounting screw
2. Screw clips
3. Chassis flange
1
2
3
Summary of Contents for ATE0743RPP
Page 20: ...2 12 NOTES ...
Page 30: ...3 10 NOTES ...
Page 71: ...7 5 WIRING DIAGRAMS DIAGRAM 1 ...
Page 72: ...7 6 DIAGRAM 3 DIAGRAM 2 ...
Page 73: ...7 7 DIAGRAM 4 DIAGRAM 5 ...
Page 74: ...7 8 DIAGRAM 7 DIAGRAM 6 ...
Page 75: ...7 9 DIAGRAM 8 ...
Page 84: ...7 18 NOTES ...
Page 90: ...8 6 NOTES ...
Page 92: ...CORPORATION ...