5-8
SOLENOID COIL
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
1.
Unplug air conditioner or disconnect power.
2.
Disconnect one of the wires from the sole-
noid coil terminals.
3.
Set the ohmmeter to the R x 100 scale.
4.
Touch the ohmmeter test leads to the
solenoid coil terminals. The meter should
indicate between 1480 and 1520
Ω
.
Refer to page 4-20 for the procedure for servic-
ing the solenoid coil.
Summary of Contents for ATE0743RPP
Page 20: ...2 12 NOTES ...
Page 30: ...3 10 NOTES ...
Page 71: ...7 5 WIRING DIAGRAMS DIAGRAM 1 ...
Page 72: ...7 6 DIAGRAM 3 DIAGRAM 2 ...
Page 73: ...7 7 DIAGRAM 4 DIAGRAM 5 ...
Page 74: ...7 8 DIAGRAM 7 DIAGRAM 6 ...
Page 75: ...7 9 DIAGRAM 8 ...
Page 84: ...7 18 NOTES ...
Page 90: ...8 6 NOTES ...
Page 92: ...CORPORATION ...