5-7
OVERLOAD PROTECTOR
Refer to page 4-14 for the procedure for servic-
ing the overload protector.
1.
Unplug air conditioner or disconnect power.
2.
Disconnect the overload protector wires.
3.
Set the ohmmeter to the R x 1 scale.
4.
Touch the ohmmeter test leads to the
overload protector terminal and connec-
tor.
5.
The meter should indicate continuity (0
Ω
).
COMPRESSOR
Refer to page 4-14 for the procedure for servic-
ing the compressor.
1.
Unplug air conditioner or disconnect power.
2.
Disconnect the three wires from the com-
pressor terminals.
3.
Set the ohmmeter to the R x 1 scale.
4.
Clip an ohmmeter test lead to the overload
protector terminal
C (W)
.
5.
Touch the free test lead to the following
compressor terminals. The meter should
indicate as shown:
Terminal
R (U)
= 0.5
Ω
Terminal
S (V)
= 3.16
Ω
Terminal
S (V)
to
R (U)
= 3.65
Ω
R
(U)
S
(V)
C
(W)
Red
Black
Blue
Compressor
Terminals
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
Summary of Contents for ATE0743RPP
Page 20: ...2 12 NOTES ...
Page 30: ...3 10 NOTES ...
Page 71: ...7 5 WIRING DIAGRAMS DIAGRAM 1 ...
Page 72: ...7 6 DIAGRAM 3 DIAGRAM 2 ...
Page 73: ...7 7 DIAGRAM 4 DIAGRAM 5 ...
Page 74: ...7 8 DIAGRAM 7 DIAGRAM 6 ...
Page 75: ...7 9 DIAGRAM 8 ...
Page 84: ...7 18 NOTES ...
Page 90: ...8 6 NOTES ...
Page 92: ...CORPORATION ...