4 Putting into operation
Check lists
The checklists below are intended to assist you in checking and
monitoring the machine before, during and after operation. These
checklists cannot claim to be exhaustive.
If the answer to one of the following questions is NO, first rectify the cause
of the fault (or have it rectified) before starting or continuing work.
The checking and monitoring work listed below is described in greater
detail in the following chapters.
Start-up checklist
Check and observe the following points before putting the machine into
operation or starting the engine:
No.
Question
Page
✔
1
Enough fuel in the tank?
2
Water in water separator and fuel filter checked and
drained if necessary?
3
Correct engine oil level?
4
Coolant level OK?
5
Correct oil level in the hydraulic oil
reservoir?
6
Water level in washer tank OK?
7
Lubrication points greased?
8
Tracks checked for cracks, cuts, etc.?
--
9
Light system, signaling, warning and indicator lights
operational?
--
10
Windows, mirrors, lights, steps, all pedals and control
levers clean?
--
11
All control levers and pedals in neutral position?
--
12
Control lever base raised?
13
Attachment safely locked?
14
Tank cover closed?
Engine cover locked?
15
Especially after cleaning, maintenance or repair
work: Rags, tools and other loose objects removed?
--
16
Seating position adjusted correctly?
17
Are all mirrors functional and adjusted correctly?
18
Seat belt fastened?
19
Before putting the machine into operation, ensure
that nobody is in the danger zone.
--
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...