
6-6
BA ET18, 20, 24 en* 1.5 * et18_20_24t600.fm
6 Transport
6.3
Transporting the machine
Important information regarding transport
The swivel unit brake is enabled if:
• the control lever base is raised.
• The starter is turned to position
0
or the engine is stopped.
This secures the upper carriage against rotation.
Tying down
1. Ensure that the authorized maximum height is not exceeded.
2. Secure the machine at the tie-down points.
3. Position the boom straight ahead at the center of the machine.
4. Lower the boom and the stabilizer blade.
5. Firmly fasten the machine on the loading area with tie-down points
A
with slings of appropriate
size (observe the legal regulations).
6. Before transporting the machine through heavy rain:
close the outlet of the exhaust pipe with a simple cap or suitable
adhesive tape.
7. Ensure that the driver of the transport vehicle knows the overall height,
width and weight of his transport vehicle (including the machine) before
moving off, and the legal transport regulations of the countries where
transport is taking place.
Fig. 228Tying down the machine
A
Fig. 229Lashing points on either side of stabilizer
blade
A
Fig. 230Lashing points inside the travel gear
A
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...