9-38
BA ET18, 20, 24 en* 1.5 * et18_20_24t900.fm
9 Technical data
Safety instructions – stability table
The values of the stability tables apply to lifting gear applications.
DANGER
Crushing hazard due to tipping over of machine.
Causes serious crushing or injury resulting in death.
►
Do not exceed the weight specified in the stability table.
►
Get informed on the lift capacity of the attachment before using it.
►
If an attachment with load hook or joint rod is installed, the weight of the
attachment must be subtracted from the weight specified in the table.
►
Use the machine for lifting gear applications only if the mandatory
lifting gear (for example a load hook) and safety equipment (for
example optical and acoustic warning devices (safe load indicator),
stability table, hose burst valve) is installed, functional and enabled.
►
Do not tilt the upper carriage (VDS).
►
Do not retract the telescopic travel gear (option).
►
Observe chapter
Safety/Safety instructions regarding lifting gear
applications
.
NOTICE
If the specified weight is exceeded, danger of damage to property due to
tipping over of machine.
►
Do not exceed the weight specified in the stability table.
Information
The indications are only approximate values. Attachments, uneven
ground and soft or bad ground conditions affect lift capacity. The operator
must take these influences into account.
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...