
7-18
BA ET18, 20, 24 en* 1.5 * et18_20_24w700.fm
7 Maintenance
6. Install the lifting gear at the points on the cabin provided for lifting the
machine. The required length
L1
is 1000 mm (39.4 in).
7. Apply tension to the cabin with the lifting gear.
8.
Canopy:
Remove the electric connector
B
. The connector is located
on the left behind the operator seat.
Install the protective cap to protect the connector.
9.
Cabin (option):
Fold cover
C
forward. Remove the electric connector
B
. The connector is located on the left behind the operator seat.
Install the protective cap to protect the connector.
10.Raise the floor mat on either side.
11.Remove screws
D
on either side in the leg-room area.
Fig. 244Installing lifting gear
L1
L1
L1
Fig. 245Removing the connector (canopy)
B
Fig. 246Removing the connector (cabin)
B
C
Fig. 247Screws on the left and right
D
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...