BA ET18, 20, 24 en* 1.5 * et18_20_24i400.fm
4-19
Putting into operation
4
Protective structures
Protective structures are additional elements that protect the operator or
user against hazards. These elements can be installed later on or as
standard equipment.
DANGER
Accident hazard due to modified cabin and protective structures!
Causes serious injury or death.
►
No drilling, cutting or grinding.
►
Do not install any brackets.
►
No welding, straightening or bending.
►
Replace the complete protective structure if it is damaged, deformed or
cracked.
►
Contact a Wacker Neuson service center in case of doubt.
►
Retrofit and repair work may only be performed by a Wacker Neuson
service center.
Information
Machine operation is only allowed with a correctly installed and intact
cabin or correctly installed and intact canopy.
For additional protection, only use correctly installed and intact Wacker
Neuson protective structures that have been released for the machine.
Information
Only a Wacker Neuson service center may install the protective structures
for the first time.
Responsibility for machine equipped with protective structures
The decision regarding the necessary protective structures (type and level
I or II) must be made by the machine owner and depends on the specific
work situation.
The machine owner must observe the national regulations and he must
inform the operator on the protective structure to be used in a specific
work situation.
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...