![Wacker Neuson ET12 02 Operator'S Manual Download Page 63](http://html1.mh-extra.com/html/wacker-neuson/et12-02/et12-02_operators-manual_3116942063.webp)
BA ET18, 20, 24 en* 1.5 * et18_20_24i400.fm
4-3
Putting into operation
4
Releasing the door arrester
Pull button
A
to release the door out of the arrester.
Opening the door to a gap
NOTICE
The door can be damaged.
►
Bear in mind the larger width of the machine if the door is opened to a
gap.
►
Close the doors when performing machine travel through passages.
1. Raise door opener
A
.
2. Open the door until it engages in door lock
B
.
3. Let door opener
A
engage in door lock
B
.
Unlocking (from inside):
Press lever
C
inside on the door lock downward.
Unlocking (from outside):
Press the handle.
Fig. 55Releasing the door arrester
A
Fig. 56Opening the door to a gap
A
B
C
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...