
BA ET18, 20, 24 en* 1.5 * et18_20_24i400.fm
4-21
Putting into operation
4
5. Mounting point for cabin/canopy:
B
6. Tighten screws
D
(M12/10.9) and lock nuts on the left and right to 110
Nm (87 ft.lbs).
7. Install the mirrors in both positions
C
.
Assembly (black screen)
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Remove all lights and mirrors (option).
3. A minimum 2 persons are required for installing/removing.
4. Mounting point for cabin/canopy:
B
5. Tighten screws
D
(M10/8.8) and lock nuts on the left and right to 45
Nm (33 ft.lbs).
6. Tighten screws
E
(M12/8.8) and lock nuts on the left and right to 87 Nm
(64 ft.lbs).
7. Install the mirrors in both positions
C
.
Fig. 89FOPS mounting point (above on machine)
B
Fig. 90Black/gray FOPS (assembly)
D
E
C
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...