
BA ET18, 20, 24 en* 1.5 * et18_20_24w700.fm
7-5
Maintenance
7
Information
Maintenance with the note
Wacker Neuson service center
must only be
performed by the trained and qualified personnel of a
Wacker Neuson
service center
.
Information
The maintenance meter starts at 500.0 hours. It counts down to 0.0 hours. A
wrench symbol flashes as soon as the maintenance meter reaches this value.
Every 1000 (2000, 3000, 4000, etc.) operating hours or once a year (Wacker Neuson service center)
Hydraulic oil replacement
--
Replacement of hydraulic oil reservoir breather filter
--
Drive gearbox oil replacement
--
Replacement of air filter elements
1
1.
Air filter replacement according to the dirt indicator, every 1000 o/h or once a year at the latest. (Replace after 50 o/h when in extensive use in environments with acidic
air, such as acid production facilities, steel and aluminum mills, chemical plants and other nonferrous-metal plants, independently of the dirt indicator)
--
Check the pilot control filter for dirt, clean it if necessary
--
Check valve clearance, adjust if necessary
--
Replacing the fresh-air filter
--
All steps for maintenance once a day and once a week (and all steps for maintenance at
500 operating hours)
Option
Wear of load hook and joint rod (check at least once a year)
--
Every 1500 (3000, 4500, etc.) operating hours (Wacker Neuson service center)
Check the injection nozzles and clean and test them if necessary
--
All steps for maintenance once a day and once a week (and all steps for maintenance at
500 operating hours)
Every 2000 (4000, 6000, etc.) operating hours or every 2 years (Wacker Neuson service center)
Coolant replacement
--
Check the bladder-type accumulator
--
All steps for maintenance once a day and once a week (and all steps for maintenance at
500 and 1000 operating hours)
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...