
BA ET18, 20, 24 en* 1.5 * et18_20_24i400.fm
4-25
Putting into operation
4
Job site
Work range height
A
: 120 cm (47 in),
E
: 50 cm (20 in).
Figures 96 and 97 refer to work with a Wacker Neuson hydraulic hammer.
Information
Working with another attachment can modify the height of the job site.
Installing/removing the shatter protection
1. A minimum 2 persons are required for installing/removing.
2. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
3. Install/remove shatter protection
A
from the front and fasten/remove it
at the fastening points
B
with the fastening material supplied.
4. Tighten screws
C
at fastening points
B
to 25 Nm (18 ft.lbs).
Fig. 96Job site with shatter protection
E
A
Fig. 97Work area with shatter protection (top
view)
Fig. 98Shatter protection (assembly)
B
B
A
Fig. 99Shatter protection (assembly)
C
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...