
BA ET18, 20, 24 en* 1.5 * Sicherheit_12072013.fm
2-9
Safety
2
Lifting gear applications
• The machine must be certified for lifting gear applications.
• Observe the national regulations for lifting gear applications.
• Lifting gear applications are procedures involving raising, transporting
and lowering loads with the help of lifting and fastening gear.
• The help of an accompanying person is necessary for fastening,
guiding and removing the load.
• There must be nobody under the load.
• Stop the machine immediately and stop the engine if persons enter the
danger zone.
• Use the machine for lifting gear applications ONLY if the mandatory
lifting gear (for example a joint rod and load hook) and safety
equipment (for example optical and acoustic warning devices, hose
burst valve, stability table) is installed and functional.
• Use only lifting and fastening gear certified by a test/certification body,
observe the inspection intervals (Use only chains and shackles. No
belts, slings or cables).
• Do not use any lifting and fastening gear that is dirty, damaged or not
of sufficient size.
• Do not interrupt the work process with a load attached.
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...