
4-20
BA ET18, 20, 24 en* 1.5 * et18_20_24i400.fm
4 Putting into operation
Protective FOPS structure/small screen – category I (option)
DANGER
Crushing hazard! Falling objects!
Causes serious injury or death.
►
Install a protective FOPS structure in areas with danger of falling
objects.
►
Machine operation is prohibited without a protective FOPS structure.
Information
The protective FOPS structure corresponds to category I according to ISO
3449:1992
►
The machine owner must ensure that the hazard situation is evaluated
and that the national regulations are observed.
►
The machine owner must ensure that only work is performed that does
not require any higher protection.
►
Accidents cannot be fully avoided despite equipping a machine with
protective structures.
Assembly (gray screen)
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Remove all lights and mirrors (option).
3. A minimum 2 persons are required for installing/removing.
4. Mounting point for protective structure:
A
Fig. 87Protective FOPS structure/small screen –
category I (symbolic representation)
Fig. 88Small/gray FOPS (assembly)
C
A
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...