
BA ET18, 20, 24 en* 1.5 * et18_20_24w710.fm
7-39
Maintenance
7
7.11 V-belt
Checking V-belt condition and tension
WARNING
Injury hazard due to rotating parts!
Rotating parts can cause serious injury or death.
►
Stop the engine before opening the engine cover.
►
Only check the V-belt when the engine is at a standstill.
NOTICE
Danger of damage to property in case of a malfunctioning V-belt.
►
Do not start the engine.
1. Park the vehicle on firm, level, and horizontal ground.
2. Stop the engine. See “Preparing lubrication”.
3. Remove the starting key and carry it with you.
4. Let the engine cool down.
5. Open the engine cover.
6. Carefully check V-belt
A
for damage, cracks or cuts.
7. If the V-belt is damaged (cracks, wear, ruptures, etc.):
➥
Have the V-belt replaced by a Wacker Neuson service center.
➥
Replace the V-belt if it touches the base of the V-belt groove or if
the pulleys are damaged.
8. Press with your thumb about 100 N (22.5 lbf) to check the deflection of
the V-belt between the crankshaft disk and the fan wheel.
9. A new V-belt should have a deflection of 6 to 8 mm (0.24 to 0.31 in), a
used V-belt (after about 5 minutes running time) should have a
deflection of 7 to 9 mm (0.27 to 0.35 in).
10.If V-belt tension is not correct:
➥
Have the V-belt replaced or retightened by a Wacker Neuson
service center.
11.Close and lock the engine cover.
Fig. 269Checking V-belt condition and tension
About 8 mm (0.31 in)
A
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...