
BA ET18, 20, 24 en* 1.5 * et18_20_24e300.fm
3-1
Introduction
3
3
Introduction
3.1
Machine overview
Fig. 2Machine overview
Position
Designation
1
Working light on boom
2
Roof lights (option)
3
Lifting eye
4
Rotating beacon (option)
5
Door arrester
6
Engine cover
7
Fuel tank filler inlet
8
Side cover
9
Exhaust pipe
10
Tie-down point for tying down the
machine
11
Stabilizer blade
12
Travel gear
13
Handhold
14
Auxiliary hydraulics
15
Door handle and lock
2
12
1
6
13
11
10
15
2
8
4
5
9
14
10
2
3
3
13
8
10
10
7
Summary of Contents for ET12 02
Page 8: ...EG 4 BA ET18 20 24 en 1 5 et18_20_24konf fm Declaration of conformity Notes...
Page 16: ...1 8 BA ET18 20 24 en 1 5 et18_20_24v100 fm 1 Foreword Notes...
Page 48: ...3 12 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction Warning labels Cabin Canopy...
Page 53: ...BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 17 Introduction 3 Information labels...
Page 60: ...3 24 BA ET18 20 24 en 1 5 et18_20_24e300 fm 3 Introduction...
Page 104: ...4 44 BA ET18 20 24 en 1 5 et18_20_24i400 fm 4 Putting into operation...
Page 118: ...5 14 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation...
Page 170: ...5 66 BA ET18 20 24 en 1 5 et18_20_24b510 fm 5 Operation Notes...
Page 178: ...6 8 BA ET18 20 24 en 1 5 et18_20_24t600 fm 6 Transport...
Page 230: ...7 52 BA ET18 20 24 en 1 5 et18_20_24w710 fm 7 Maintenance Notes...
Page 280: ...9 48 BA ET18 20 24 en 1 5 et18_20_24t900 fm 9 Technical data Notes...