6.
Select the upper rated output.
Constant temperature control
unit:
K
+
d
press simultaneously:
"
1
" is shown.
a
press:
"
2
" is shown.
Weather-compensated control
unit:
K
+
d
press simultaneously:
"
Relay test
" and then
"
Base load
" is shown.
a
press:
"
Full load
" is shown.
7.
Check the CO
2
or O
2
and CO con-
tent. Enter actual values into the
service report.
8.
Press
d
.
Operation with the upper rated out-
put is terminated.
Maintain limits to EN 483 and EN 297
(CO content < 1000 ppm).
If the actual value falls outside the
permissible range, check the follow-
ing:
&
Balanced flue system for soundness
(see page 30)
&
Static and supply pressure (see
page 25)
&
Nozzle pressure (see page 27)
Further details regarding the individual steps
(cont.)
39
Commissioning, inspection, maintenance
5592
817
GB
Service
Summary of Contents for VITOPEND 200
Page 12: ...Opening the control unit casing 12 Installation sequence 5592 817 GB...
Page 16: ...Fitting the programming unit into the control unit 16 Installation sequence 5592 817 GB...
Page 17: ...Fitting the front panel 17 Installation sequence 5592 817 GB Installation...
Page 113: ...Connection and wiring diagram internal connections 113 Designs 5592 817 GB Service...
Page 119: ...Parts lists cont 119 Parts lists 5592 817 GB Service...
Page 120: ...Parts lists cont 120 Parts lists 5592 817 GB...
Page 121: ...Parts lists cont 121 Parts lists 5592 817 GB Service...
Page 122: ...Parts lists cont 122 Parts lists 5592 817 GB...
Page 130: ...130 5592 817 GB...
Page 131: ...131 5592 817 GB...