1.
Switch ON the control unit and call
up the relay test:
Constant temperature control
unit:
K
+
d
press simultaneously for
at least 2 s.
a
/
b
press, until "
5
" is dis-
played.
Weather-compensated control
unit:
K
+
d
press simultaneously for
at least 2 s.
a
/
b
press, until "
Valve in mid-
dle pos.
" is displayed.
2.
Wait until the valve has moved into
its central position (approx. 5 s),
then switch OFF the main ON/OFF
switch "
8
" at the control unit.
3.
Drain the heating system via the
boiler fill & drain valve
A
.
Further details regarding the individual steps
(cont.)
31
Commissioning, inspection, maintenance
5592
817
GB
Service
Summary of Contents for VITOPEND 200
Page 12: ...Opening the control unit casing 12 Installation sequence 5592 817 GB...
Page 16: ...Fitting the programming unit into the control unit 16 Installation sequence 5592 817 GB...
Page 17: ...Fitting the front panel 17 Installation sequence 5592 817 GB Installation...
Page 113: ...Connection and wiring diagram internal connections 113 Designs 5592 817 GB Service...
Page 119: ...Parts lists cont 119 Parts lists 5592 817 GB Service...
Page 120: ...Parts lists cont 120 Parts lists 5592 817 GB...
Page 121: ...Parts lists cont 121 Parts lists 5592 817 GB Service...
Page 122: ...Parts lists cont 122 Parts lists 5592 817 GB...
Page 130: ...130 5592 817 GB...
Page 131: ...131 5592 817 GB...