Flue gas emissions test
Coaxial boiler flue connection
Coaxial boiler flue connection bend
Parallel boiler flue connection
A
Flue gas
B
Ventilation air
1.
Connect the flue gas analyser to
test port
A
.
2.
Open the gas shut-off valve. Start
the boiler.
3.
Select the lower rated output.
Constant temperature control
unit:
K
+
d
press simultaneously:
"
1
" is shown.
Weather-compensated control
unit:
K
+
d
press simultaneously:
"
Relay test
" and then
"
Base load
" is shown.
4.
Check the CO
2
or O
2
and CO con-
tent. Enter actual values into the
service report.
5.
Press
d
.
Operation with the lower rated out-
put is terminated.
Further details regarding the individual steps
(cont.)
38
Commissioning, inspection, maintenance
5592
817
GB
Summary of Contents for VITOPEND 200
Page 12: ...Opening the control unit casing 12 Installation sequence 5592 817 GB...
Page 16: ...Fitting the programming unit into the control unit 16 Installation sequence 5592 817 GB...
Page 17: ...Fitting the front panel 17 Installation sequence 5592 817 GB Installation...
Page 113: ...Connection and wiring diagram internal connections 113 Designs 5592 817 GB Service...
Page 119: ...Parts lists cont 119 Parts lists 5592 817 GB Service...
Page 120: ...Parts lists cont 120 Parts lists 5592 817 GB...
Page 121: ...Parts lists cont 121 Parts lists 5592 817 GB Service...
Page 122: ...Parts lists cont 122 Parts lists 5592 817 GB...
Page 130: ...130 5592 817 GB...
Page 131: ...131 5592 817 GB...