9.
Open the gas shut-off valve and
start up the boiler.
Danger
Gas escaping from the test
port leads to a risk of explo-
sion.
Check the test connector for
soundness.
Supply (flow)
pressure for nat-
ural gas
Supply (flow)
pressure for
LPG
Measures
below 17.4 mbar
below 42.5 mbar
Do not start the boiler. Notify your
mains gas or LPG supplier.
17.4 to 25 mbar
42.5 to 57.5 mbar
Start the boiler.
above 25 mbar
above 57.5 mbar
Install a separate gas pressure gover-
nor upstream of the system and regu-
late the inlet pressure to 20 mbar for
natural gas or 50 mbar for LPG. Notify
your mains gas or LPG supplier.
Further details regarding the individual steps
(cont.)
26
Commissioning, inspection, maintenance
5592
817
GB
Summary of Contents for VITOPEND 200
Page 12: ...Opening the control unit casing 12 Installation sequence 5592 817 GB...
Page 16: ...Fitting the programming unit into the control unit 16 Installation sequence 5592 817 GB...
Page 17: ...Fitting the front panel 17 Installation sequence 5592 817 GB Installation...
Page 113: ...Connection and wiring diagram internal connections 113 Designs 5592 817 GB Service...
Page 119: ...Parts lists cont 119 Parts lists 5592 817 GB Service...
Page 120: ...Parts lists cont 120 Parts lists 5592 817 GB...
Page 121: ...Parts lists cont 121 Parts lists 5592 817 GB Service...
Page 122: ...Parts lists cont 122 Parts lists 5592 817 GB...
Page 130: ...130 5592 817 GB...
Page 131: ...131 5592 817 GB...