Checking the nozzle pressure
A
Test connector
B
Cap
C
Screw
D
Phillips screw
1.
Close the gas shut-off valve.
2.
Release the screw inside test
connector
A
, but do not remove,
then connect the pressure gauge.
3.
Open the gas shut-off valve. Start
the boiler.
4.
Select the upper rated output.
Constant temperature control
unit:
K
+
d
press simultaneously:
"
1
" is shown.
a
press:
"
2
" is shown.
Weather-compensated control
unit:
K
+
d
press simultaneously:
"
Relay test
" and then
"
Base load
" is shown.
a
"
Full load
" is shown.
5.
Remove cap
B
from the gas
train.
6.
Test the nozzle pressure at the
upper rated output.
In case of
deviations from the value
shown in the following table
,
adjust the nozzle pressure for the
upper rated output at screw
C
(SW 10).
7.
Press
d
.
Operation with the upper output is
terminated.
8.
Select the lower rated output.
Constant temperature control
unit:
K
+
d
press simultaneously:
"
1
" is shown.
Weather-compensated control
unit:
K
+
d
press simultaneously:
"
Relay test
" and then
"
Base load
" is shown.
Further details regarding the individual steps
(cont.)
27
Commissioning, inspection, maintenance
5592
817
GB
Service
Summary of Contents for VITOPEND 200
Page 12: ...Opening the control unit casing 12 Installation sequence 5592 817 GB...
Page 16: ...Fitting the programming unit into the control unit 16 Installation sequence 5592 817 GB...
Page 17: ...Fitting the front panel 17 Installation sequence 5592 817 GB Installation...
Page 113: ...Connection and wiring diagram internal connections 113 Designs 5592 817 GB Service...
Page 119: ...Parts lists cont 119 Parts lists 5592 817 GB Service...
Page 120: ...Parts lists cont 120 Parts lists 5592 817 GB...
Page 121: ...Parts lists cont 121 Parts lists 5592 817 GB Service...
Page 122: ...Parts lists cont 122 Parts lists 5592 817 GB...
Page 130: ...130 5592 817 GB...
Page 131: ...131 5592 817 GB...