CONTENTS ......................................................................PAGE
Ratings and Dimensions .............................................................2
Installation Requirements:
Boiler Location..........................................................................3
Clearances ............................................................................3-4
Vent Requirements ...................................................................3
Vent Piping ...............................................................................3
Installing Water trim..................................................................3
Installing Burner .......................................................................5
Oil Supply Piping......................................................................6
Wiring the Boiler ..........................................................................6
Operating Instructions:
Precautions Before Starting .....................................................6
Start-up .....................................................................................6
Cleaning and Filling New Water Boiler ....................................6
Wiring Diagrams....................................................................7-9
Burner Data:
Riello..................................................................................10-11
Care and Maintenance:
Extended Shutdown...............................................................12
Freezing Protection ................................................................12
Oil Burner................................................................................12
General Maintenance .............................................................12
Appendix A–G .....................................................................13-15
SAFETY WARNING:
KEEP BOILER AREA CLEAR AND FREE FROM
COMBUSTIBLE MATERIALS, GASOLINE AND
OTHER FLAMMABLE VAPORS AND LIQUIDS.
FAILURE TO ADHERE TO ABOVE SAFETY
WARNING, MAY RESULT IN PERSONAL INJURY
OR DEATH AND PROPERTY DAMAGE.
IMPORTANT:
The installation of this equipment must
conform to the requirements of the authority having juris-
diction or, in the absence of such requirements, to the
Installation of Oil Burning Equipment, CSA B139, latest
edition. The installation must also conform to the addi-
tional requirements in this Slant/Fin Instruction Manual.
Where there is any difference, the more stringent require-
ment shall govern.
In addition, where required by the authority having juris -
dic tion, the installation must conform to American Society
of Mechanical Engineers Safety Code for Controls and
Safety Devices for Automatically Fired Boilers, No. CSD-1
or CSA B149.1-00 for natural gas and propane. If there is
any conflict in the above requirements, then the more
stringent requirement will apply.
THIS MANUAL MUST BE LEFT WITH OWNER AND
SHOULD BE HUNG ON OR ADJACENT TO THE
BOILER FOR REFERENCE.
IMPORTANT: This boiler must be installed by a trained,
experienced, service technician, licensed for the installation
and servicing of oil burning equipment or otherwise qualified by
the authorities having jurisdiction over the installation.
Part No. 470908000 Publication No. EC-10DV-40
Printed in Canada 0610
Rev. A
DIRECT VENT OIL-FIRED WATER BOILER/NO. 2 OIL
INSTALLATION AND OPERATING INSTRUCTIONS
EUTECTIC
EC-10DV Series
SERVICE COMPANY
Name _______________________________________________
Address _____________________________________________
_____________________________________________________
Telephone____________________________________________
Model # _____________________________________________
Serial # ______________________________________________