EUTECTIC EC-10 DV

Maximum operating pressure 414 kPa (60 psi).
All boilers hydrostatically tested — A.S.M.E.
* For forced hot water heating systems where the boiler and all piping are locat-

ed within the area to be heated, the boiler may be selected on the basis of
D.O.E. capacity output. The net output ratings shown are based on an
allowance for piping and pickup of 1.15 (water). D.O.E.  capacity output is
divided by the allowance to obtain net rating. The Slant/Fin Technical Service
department should be consulted before selecting a boiler for  unusual piping
and pickup requirements such as intermittent system  operation, extensive pip-
ing, etc.

† Ratings apply to the use of light oil at 11000 W/L (140,000 Btu per gallon) and

apply only when burner models listed on pages 8 of this manual are used, and
are properly adjusted to produce 13% CO2.

# All dimensions subject to normal manufacturing tolerance.
NOTE:  All boilers under 87.9 kw (300,000 Btuh) input are tested and rated for
capacity under the U.S. Department of Energy (D.O.E.) Test Procedures for Boil-
ers.

TABLE 1:  Ratings and Dimensions

Figure 1: Dimensions

Boiler

Model No.

OIL INPUT

GROSS

OUTPUT

NET OUT-

PUT

.         DIMENSIONS                  .

APPROX.

OVERALL

LENGTH

"A"

BOILER

LENGTH 

"B"

BOILER

LENGTH

"C"

FLUE DIA

"D"

DISTANCE

BETWEEN

LEGS

"E"

FLUE

OUTLET

LENGTH

"F" 

mL/s

GPH

Watts

BTU/H

kW

MBH

kW

MBH

mm

in mm

in.

mm

in.

mm

in. mm

in.

mm in.

EC-13DV

0.72

0.68

26,672

91,000

23

79

20

69

87

914

36 25 22-1/4 686

27

127

5

300 11-13/16 51

2

EC-14DV

0.84

0.80

“32,827” “112,000” 29

98

25

85

87 1041 41 25 27-1/4 813

32

127

5

300 16-13/15 51

2

EC-15DV

1.05

1.00

“41,034” “140,000” 36

123

31

107

87 1168 46 25 32-1/4 940

37

127

5

427 21-13/16 51

2

EC-16DV

1.21

1.15

“47,189” “161,000” 41

141

36

123

87 1295 51 25 37-1/4 1067

42

152

6

427 26-13/16 102

4

AFUE %

835mm (32-7/8")

32mm (1-1/4")

threaded supply

60mm (2-23/64)

163mm

(6-27/64)

79mm (11-3/8)

Note: Add 203mm (8") to B dimensions to allow for Riello burner

289mm (1-1/8)

570mm (22-7/16)

355mm

(13-3/32)

195mm (7-11/16)

Relief valve

19mm (3/4")

32mm (1-1/4)

threaded return

pipe

285mm (11-7/32)

570mm (22-7/16)

563mm(22-11/64)

394mm(15-1/2)

138mm(5-7/16)

113mm

(4-7/16)

156mm

(6-9/64")

(4) 3/8-16 studs

on 

6-29/32 4

markings on 

176mm (6-15/16) 

110mm
(4-21/64) hole

130mm
(6-7/64) cut-out

Summary of Contents for EUTECTICEC-15DV

Page 1: ...the more stringent require ment shall govern In addition where required by the authority having juris diction the installation must conform to American Society of Mechanical Engineers Safety Code for...

Page 2: ...Department of Energy D O E Test Procedures for Boil ers TABLE 1 Ratings and Dimensions Figure 1 Dimensions Boiler Model No OIL INPUT GROSS OUTPUT NET OUT PUT DIMENSIONS APPROX OVERALL LENGTH A BOILER...

Page 3: ...minate vent under decks stairways or car ports When ever possible locations under windows should be avoided Vent termination should not be mounted directly above or within 914mm 3 feet horizontally fr...

Page 4: ...be left clear around the boiler Do not stack items on or box in the appliance within the required clearances to combustibles The figures stated in metric inches in the drawing below are the minimum re...

Page 5: ...See Burner Data pages 9 10 and Burner Manual supplied with burner If burner is not mounted as received mount to boiler placing flange over mounting studs Use gasket between flange and boiler Distance...

Page 6: ...and air supply pipe are properly installed and clear of obstruction Note Neither overfire nor flue draft should exceed 8 9mm 0 35 WC during burner operation THE FLUE IS UNDER POSITIVE PRESSURE DURING...

Page 7: ...EUTECTIC EC 10 DV 7 Honeywell L7248L Control...

Page 8: ...EUTECTIC EC 10 DV 8 Honeywell L7248L with SF 10 Control...

Page 9: ...of interest For example press I High Limit HL is displayed followed by a three digit number i e 220 followed by F or C Pressing the I button again on L7224 models will display the Low Limit LL followe...

Page 10: ...2 4 2 none 107 95 4 25 EUTECTIC EC 10 DV 10 Models BF 3 BF 5 Electrode Setting Turbulator location Picture 1 TURBULATOR SETTING 1 Loosen nut 1 then turn the screw 2 until the index marker 3 is aligne...

Page 11: ...r to increase combustion air turn the screw clockwise indicator to decrease combustion air 3 The final position of the air damper will vary on each installation Use instruments to establish the proper...

Page 12: ...oped in the combustion chamber Vacuum the loose soot and debris from the boiler Clean and replace baffle plates Inspect the burner combustion head Clean if necessary and make sure all the adjustments...

Page 13: ...approximately 54 degrees Celsius 130 degrees Fahrenheit most of the flow will be through the system Mounting TV can be installed in any position An adjustable balancing valve or ball valve must be ins...

Page 14: ...d by local codes If the boiler is installed above the radiation level a low water cut off device must be installed in all instances Do not install an isolation valve between the boiler and the low wat...

Page 15: ...er hinges 2 You may have to loosen the cast iron hinge pin 3 to facilitate removal of the lower hinge 3 Remove the cast iron hinge pin 3 which is attached by two 13 mm bolts 4 4 Re install the two bol...

Page 16: ...Fin Corp 2008 SLANT FIN LTD LTEE 6450 Northam Drive Mississauga Ontario L4V 1H9 Phone 905 677 8400 FAX 905 677 1829 Order Desk Fax 905 677 9015 www slantcan ca E mail orderdesk slantfin ca info slant...

Reviews: