
10
© 2007 - 2008 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO167/207/237
PAPER FEEDING SYSTEM
10 - 21
[L] Pickup roller
[M] Registration roller clutch (CLT1)
(1) Take off the drawer.
(2) Rotate the pickup roller shaft counterclock-
wise to make the rubber surface of the roller
facing down.
Note:
Because the tension is applied to the pickup
roller shaft by the pickup clutch when it is
rotated counter-clockwise, be sure to hold
the shaft while replacing the roller.
(3) Push 2 latches each to take off 2 pickup roll-
ers.
Notes:
• Be sure to install the pickup roller in the
correct direction when reassembling it.
• When it is difficult to take off the pickup
roller, alternatively follow the procedure
below to remove it.
1. Take off the damp heater unit or
dummy
plate.
P.10-19 "[J] Damp heater unit (DH3) /
Dummy plate"
2. Take off 2 pickup rollers by releasing 2
latches each.
Fig. 10-35
Fig. 10-36
(1) Take off the rear cover.
P.2-22 "[J] Rear cover"
(2) Remove 2 screws and take off registration
roller holder.
Note:
When installing the registration roller holder,
engage the arm of the registration roller
clutch with the rotation stopper of the regis-
tration roller holder.
Fig. 10-37
Pickup roller
Pickup roller
Registration roller holder
Rotation stopper
Summary of Contents for e-studio 167
Page 8: ...e STUDIO167 207 237 2007 2008 TOSHIBA TEC CORPORATION All rights reserved CONTENTS 4 ...
Page 68: ...e STUDIO167 207 237 2007 2008 TOSHIBA TEC CORPORATION All rights reserved COPY PROCESS 3 14 ...
Page 92: ...e STUDIO167 207 237 2007 2008 TOSHIBA TEC CORPORATION All rights reserved CONTROL PANEL 5 10 ...
Page 120: ...e STUDIO167 207 237 2007 2008 TOSHIBA TEC CORPORATION All rights reserved SCANNER 6 28 ...
Page 144: ...e STUDIO167 207 237 2007 2008 TOSHIBA TEC CORPORATION All rights reserved DRIVE UNIT 9 10 ...
Page 267: ......
Page 268: ......