Thermo Scientific
TSQ Quantum XLS User Guide
167
Index:
N
defined
description
quadrupole rod assembly, functional description
mass anaysis
RF and dc fields (figure)
mass range
mass spectrometer
and direct sample probe
CI gas valve
circuit breaker, location (figure)
collision gas valve
diagnostics
electronic assemblies
electronics service switch, location (figure)
emergency shutdown
front panel LEDs
functional description
fuses, replacing
inlet gasses hardware
inlet valve (figure)
ion detection system
ion detection system electronic assemblies
ion gauge
ion optics
ion source
–
LEDs and system startup
maintenance procedures (table)
mass analyzer
Off condition
On/Off status of components
Power Entry Module, description
power outlet
Q0 quadrupole
resetting
RF voltage generation electronic assemblies
right-side power panel
shutdown
Standby condition
startup
turbomolecular pump
vacuum manifold
vacuum service switch, location (figure)
vacuum system
vent valve
mass spectrometer circuit breaker
location (figure)
mechanical pump
MS main power circuit breaker
mass spectrometer components On/Off status
MS/MS scan modes
Neutral Loss
Parent
Product
N
Neutral Loss scan mode
discussed
example (figure)
illustration (figure)
O
octafluoronaphthalene
Off condition, mass spectrometer components On/Off status
offset voltage, quadrupole
oxygen trap
P
Parent
Parent scan mode
discussed
illustration (figure)
Perfluorotetracosane
personal computer, features
phthalate contamination
power cord, forepump (Caution)
Power Entry Module, description
Power LED
description
figure
mass spectrometer reset
mass spectrometer startup
power supply problems, troubleshooting
pressure, maximim allowed (table)
probe button
procedures
adding calibration compound
changing ionization modes
cleaning ion source components
cleaning ion source lenses
,
cleaning ion volumes
cleaning stainless steel parts
complete system shutdown
conditioning capillary columns
disassembling ion source lens assembly
displaying FC-43 spectrum
dissassembling ion source completely
emergency shutdown
GC leak checking
installing capillary column
installing the ion volume
maintaining forepump
operating the inlet valve
placing system in standby
reassembly ion source lenses