8
Using the Direct Sample Probe
Preparing the Probe and Inlet Valve
Thermo Scientific
TSQ Quantum XLS and TSQ Quantum GC User Guide
151
Preparing the Probe and Inlet Valve
Y
To prepare the probe and inlet valve
1. Connect the direct sample probe controller to the mass spectrometer by contact closure
with the probe start cable (P/N 70111-63627, in TSQ Quantum XLS or TSQ Quantum
GC Accessory Kit).
2. Create a probe method on the controller. Refer to the probe manual. This example uses
the following DIP settings:
• Initial temperature:
50
º
C
• Initial time:
5 s
• Ramp rate:
100
º
C/min
• Final temperature:
200
º
C
• Ramp hold time:
200 s
3. Load sample on the probe.
4. Install the guide bar.
a. With the guide ball track facing left, insert the guide bar into the entry housing. See
.
b. Push the guide bar in as far as it goes. Rotate it 90° clockwise to lock the guide bar in
the entry housing.
5. Prepare the inlet valve.
a. Make sure the inlet valve is closed with the inlet valve lever down, as shown in
.
b. Loosen the inlet valve knob counter-clockwise, and remove the inlet valve plug.
Preparing the Mass Spectrometer
Y
To prepare the TSQ Quantum XLS for the experiment
1. Choose
Start > All Programs > Thermo Instruments > TSQ > TSQ Tune
to open the
EZ Tune window if it is not already open.
2. Ensure that the TSQ Quantum XLS or TSQ Quantum GC mass spectrometer is the only
instrument in use and that there are no start instruments.
IMPORTANT
The TSQ EZ Tune window must be open for the mass spectrometer to
initiate the probe insertion sequence.