73
System Check List
BATTERY BOX -
Mounting claws (or
direct frame mounted bolts) positioned
correctly and torqued to specifications.
CONDENSER -
Mounting bolts tightened
securely and sealed with silicone.
RECEIVER DRIER -
Mounting bands
tightened securely.
EVAPORATOR / CONTROL BOX -
Mounting bolts tightened securely and
sealed with silicone.
EVAPORATOR DRAIN TUBES -
Installed and access holes in floor
sealed with silicone.
REFRIGERATION HOSES -
Routed
and secured to allow for movement
and vibration.
REFRIGERATION FITTINGS -
Tightened to proper torque
specifications.
ELECTRICAL -
Electrical wiring and
battery cables connected tightly,
properly routed and secured.
A/C SYSTEM -
Properly charged and
free of leaks.
HEATER INTAKE AND EXHAUST
-
Heater intake and exhaust hoses
routed safely and secured.
HEATER FUEL LINES -
All fuel lines
are routed safely and secured.
HEATER FUEL LINE
CONNECTIONS -
All fuel line
connections are tight and leak
free.
SAFETY GUARDS
- All covers and
grilles Installed securely.
AIR GAPS -
Verified any unused holes
in the sleeper floor are completely
sealed closed with caulking and the 3”
access hole inside the sleeper floor is
completely caulked from both inside
and underneath.
SYSTEM OPERATION -
The
Operation Checkout Procedures were
run, all system components operate
correctly with no error codes.
TRACTOR INTERIOR -
Thoroughly
cleaned and vacuumed.
RELEASE TO CUSTOMER.
Summary of Contents for TriPac Envidia
Page 2: ......
Page 11: ...9 Battery Box Dimensions Figure 1 Battery Box Dimensions...
Page 12: ...10 Battery Box Dimensions continued Figure 2 Battery Box Dimensions continued...
Page 13: ...11 Evaporator Control Box Dimensions Figure 3 Evaporator Control Box Dimensions...
Page 14: ...12 Condenser with Receiver Drier Dimensions Figure 4 Condenser with Receiver Drier Dimensions...
Page 15: ...13 HMI Dimensions Figure 5 HMI Dimensions...
Page 16: ...14 1000 Watt Power Inverter Dimensions Option Figure 6 1000 Watt Power Inverter Dimensions...
Page 18: ...16 D2 D4 Heater Dimensions Option Figure 8 Heater Dimension...
Page 19: ...17 BLANK PAGE...
Page 21: ...19 Typical Component Locations Figure 9 Typical Component Locations...
Page 45: ...43 A C Duct Installation continued FLUSH MOUNTED EVAPORATOR Figure 21 A C Duct locations...
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......