45
Battery Box Harness Installation (continued)
From Evaporator/Control Box
10.
From the Evaporator/Control Box route the RED and BLACK (4 AWG) Compressor Drive Module power
cables through the floor access hole with the refrigerant lines. Route cables to the back of the TriPac Envidia
Battery Box.
NOTE: These cables are pre-connected to the Compressor Drive Module inside the
Evaporator/Control Box.
11.
Route the positive cable (RED) through the upper hole in the back of the battery box to the F10 (150 amp) fuse
in the holder.
12.
Cut cable to length and install terminal with 1/4” hole.
13.
Connect to F10 fuse holder terminal. Torque nut to 120 in-lb (13.5 N•m).
14.
Route the negative (BLACK) cable through the lower hole in the back of the battery box to the chassis ground
stud.
15.
Cut cable to length and install terminal with 3/8” hole.
16.
Secure to existing cables.
17.
Connect to chassis ground stud.
Figure 23: Battery Box harness connections
Summary of Contents for TriPac Envidia
Page 2: ......
Page 11: ...9 Battery Box Dimensions Figure 1 Battery Box Dimensions...
Page 12: ...10 Battery Box Dimensions continued Figure 2 Battery Box Dimensions continued...
Page 13: ...11 Evaporator Control Box Dimensions Figure 3 Evaporator Control Box Dimensions...
Page 14: ...12 Condenser with Receiver Drier Dimensions Figure 4 Condenser with Receiver Drier Dimensions...
Page 15: ...13 HMI Dimensions Figure 5 HMI Dimensions...
Page 16: ...14 1000 Watt Power Inverter Dimensions Option Figure 6 1000 Watt Power Inverter Dimensions...
Page 18: ...16 D2 D4 Heater Dimensions Option Figure 8 Heater Dimension...
Page 19: ...17 BLANK PAGE...
Page 21: ...19 Typical Component Locations Figure 9 Typical Component Locations...
Page 45: ...43 A C Duct Installation continued FLUSH MOUNTED EVAPORATOR Figure 21 A C Duct locations...
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......