67
Operation Checkout Procedures
Overview
An operation checkout procedure must be performed after the TriPac Envidia
installation has been completed. This procedure
will confirm the operation of the heating and air conditioning systems, and will verify the TriPac Envidia
batteries are
charging and discharging properly. Any alarm codes that may have been set can also be checked and cleared. This checkout
procedure will be done in two steps:
Step 1 -
Use the TriPac Envidia
HMI controller to verify basic system operation.
Step 2 -
Use a laptop PC connected directly to the TriPac Envidia
Base Controller module using
the Envidia Service
Tool
and
Service Test Mode
to verify system operation in more detail.
The Envidia Service Tool communication software is service computer
and will export information directly to a laptop PC.
This software provides the technician with system interface, flash load system upgrades, real time system information
retrieval, Service Test Mode and Alarm clearing capabilities.
The following tools will be required:
•
Laptop Computer (IBM Compatible).
•
USB Adapter Harness (204-2000 or USB Mini-B).
•
Envidia Service Tool software.
Step 1 – Checkout Procedures Using the HMI Controller
The following operation checkout procedures will be performed using the TriPac Envidia
HMI controller.
NOTE: Make sure the tractor’s engine is off and ignition switch is in the off position.
1.
Rotate Mode Selection knob to
Fan Mode
.
2.
Rotate Temperature Selection knob so white dot is at the top.
3.
Press Mode Selection knob for at least one second to turn the TriPac Envidia
system ON.
a.
Fan icon should flash for several seconds then stay on.
b.
Evaporator fan may not start.
c.
Battery level bars should illuminate steady green. It may take up to 30 seconds for the battery level bars to
illuminate steady green.
4.
Rotate Fan Speed Selection knob
clockwise
.
NOTE: There will be a two second delay in response to changes made using the HMI Controller.
a.
Fan speed LED indicators should increase.
b.
Evaporator fan speed should increase.
5.
Rotate Fan Speed Selection knob
counterclockwise.
a.
Fan speed LED indicators should decrease.
b.
Evaporator fan speed should decrease.
6.
Rotate Temperature Selection knob
counterclockwise
to the blue stop.
Summary of Contents for TriPac Envidia
Page 2: ......
Page 11: ...9 Battery Box Dimensions Figure 1 Battery Box Dimensions...
Page 12: ...10 Battery Box Dimensions continued Figure 2 Battery Box Dimensions continued...
Page 13: ...11 Evaporator Control Box Dimensions Figure 3 Evaporator Control Box Dimensions...
Page 14: ...12 Condenser with Receiver Drier Dimensions Figure 4 Condenser with Receiver Drier Dimensions...
Page 15: ...13 HMI Dimensions Figure 5 HMI Dimensions...
Page 16: ...14 1000 Watt Power Inverter Dimensions Option Figure 6 1000 Watt Power Inverter Dimensions...
Page 18: ...16 D2 D4 Heater Dimensions Option Figure 8 Heater Dimension...
Page 19: ...17 BLANK PAGE...
Page 21: ...19 Typical Component Locations Figure 9 Typical Component Locations...
Page 45: ...43 A C Duct Installation continued FLUSH MOUNTED EVAPORATOR Figure 21 A C Duct locations...
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......