
187
Table 6-1: T360 Maintenance Schedule
DATE PERFORMED
ITEM ACTION FREQ
CAL
CHECK
REQ’D.
MANUAL
Particulate
Filter
Replace
Weekly or as
needed
Yes
Verify Test
Functions
Record and
analyze
Weekly or after
any
Maintenance
or Repair
No
Pump
Diaphragm
Replace Annually Yes
Perform
Flow Check
Check Flow
Annually
No
Perform
Leak Check
Verify Leak
Tight
Annually or
after any
Maintenance
or Repair
No
Pneumatic
lines
Examine
and clean
As needed
Yes if
cleaned
Cleaning Clean As
needed
Only if
cover
remv’d
07272B DCN6552
Summary of Contents for T360
Page 2: ......
Page 188: ...This page intentionally left blank 07272B DCN6552 ...
Page 264: ...07272B DCN6552 ...
Page 320: ...This page intentionally left blank B 2 07272B DCN6552 ...
Page 324: ...This page intentionally left blank B 6 07272B DCN6552 ...
Page 327: ...APPENDIX D Wire List and Electronic Schematics D 1 07272B DCN6552 ...
Page 328: ...This page intentionally left blank D 2 07272B DCN6552 ...
Page 332: ...This page intentionally left blank 07272B DCN6552 D 6 ...
Page 333: ...07272B DCN6552 D 7 ...
Page 338: ...07272B DCN6552 D 12 ...