
Teledyne API Model T360/T360M Operation Manual
Calibration Procedures
181
The following example sets Sequence #2 to do a Zero-Span Calibration every
other day starting at 1 am on September 4, 2001, lasting 15 minutes, without
calibration. This will start ½ hour later each iteration.
MODE AND ATTRIBUTE
VALUE
COMMENT
Sequence 2
Define Sequence #2
Mode ZERO-SPAN
Select Zero and Span Mode
Timer Enable
ON
Enable the timer
Starting Date
Sept. 4, 2001
Start after Sept 4, 2001
Starting Time
01:00
First Span starts at 1:00AM
Delta Days
2
Do Sequence #2 every other day
Delta Time
00:30
Do Sequence #2 ½ hr later each day
Duration 15.0
Operate Span valve for 15 min
Calibrate NO
Do not calibrate at end of Sequence
NOTES
The programmed STARTING_TIME must be a minimum of 5 minutes later tha The real time
clock (see Section 4.10 for setting real time clock).
Avoid setting two or more sequences at the same time of the day. Any new sequence which is
initiated whether from a timer, the COM ports, or the contact closure inputs will override any
sequence which is in progress.
If at any time an illegal entry is selected (Example: Delta Days > 367) the ENTR button will
disappear from the display.
07272B DCN6552
Summary of Contents for T360
Page 2: ......
Page 188: ...This page intentionally left blank 07272B DCN6552 ...
Page 264: ...07272B DCN6552 ...
Page 320: ...This page intentionally left blank B 2 07272B DCN6552 ...
Page 324: ...This page intentionally left blank B 6 07272B DCN6552 ...
Page 327: ...APPENDIX D Wire List and Electronic Schematics D 1 07272B DCN6552 ...
Page 328: ...This page intentionally left blank D 2 07272B DCN6552 ...
Page 332: ...This page intentionally left blank 07272B DCN6552 D 6 ...
Page 333: ...07272B DCN6552 D 7 ...
Page 338: ...07272B DCN6552 D 12 ...