![Symmetricom TimeHub 5500 User Manual Download Page 138](http://html.mh-extra.com/html/symmetricom/timehub-5500/timehub-5500_user-manual_1419592138.webp)
138 TimeHub 5500 User’s Guide
097-55501-01 Revision M – January 2009
Chapter 4 Testing and Configuring the TimeHub
Overview
Overview
This chapter describes how to install cards into the front panel and configure the
TimeHub 5500. Perform these tasks after you install the shelf and make power,
input, alarm, and communications connections described in
. If you encounter any difficulties during the installation process,
contact Symmetricom Global Services. See
, on page 264 for telephone numbers.
Installing Cards into the Front Panel
The procedures in this section describe how to install the cards into the front panel
of the TimeHub 5500 shelf. See also
Installing Modules into the Rear Panel
page 109. Refer to
for the location of the fuse holders and slots for the
cards. Turn on power to the shelf as described in
Figure 4-1.
Front Panel of the TimeHub 5500 Shelf
Management
Card
Clock
Cards
Output Driver
Cards
B Fuse and LED
A Fuse and LED