ENGINE GENERAL INFORMATION AND DIAGNOSIS (G16/J20 ENGINES) 6-125
3
Check IAC valve referring to “IAC Valve
Inspection” in Section 6E1.
Is check result as specified?
Go to Step 4.
IAC valve malfunction, “BLU/
BLK”, “LT GRN/BLK”, “PPL/
BLK”, “GRY/BLU” or “PPL/
YEL” wire open or short or
poor coupler connection.
If all above are OK, substi-
tute a known-good ECM
(PCM) and recheck.
4
Was idle speed within specification in
Step 1?
Check for following :
• Vacuum leaks
• Air inhaling
• EVAP canister purge con-
trol system
• Accessory engine load
• Stuck of PCV valve
• Clog of idle air passage
• MAF sensor
• TP sensor
• ECT sensor
• EGR valve malfunction
(leakage from valve seat)
• A/C signal
• Transmission range switch
signal
Go to Step 5.
5
Was idle speed higher than specification
in Step 1?
Go to Step 6.
Go to Step 9.
6
Check A/C (input) signal circuit referring
to Step 1 of Table B-5 or Table B-6 A/C, if
equipped. (A/C signal can be also
checked by using SUZUKI scan tool.)
Is it in good condition?
Go to Step 7.
A/C signal circuit open or
short, or A/C system mal-
function.
7
Check ABS signal circuit for voltage if
equipped.
1) Turn ignition switch ON.
2) Check voltage between E61-30 termi-
nal of ECM (PCM) connector con-
nected and body ground.
Is voltage 10 – 14 V?
Go to step 8.
ABS signal circuit shorted to
ground or ABS malfunction.
8
Was IAC duty less than about 2% in Step
1 of this table?
Check abnormal air inhaling
from intake manifold, throttle
body, PCV valve and EVAP
canister purge control sys-
tem.
Check TP sensor (closed
throttle position) and ECT
sensor for performance.
If sensors are OK, substitute
a known-good ECM (PCM)
and recheck.
9
Check transmission range switch signal
referring to “Inspection of ECM (PCM)
and its Circuit” in this section.
Is check result satisfactory?
Go to Step 10.
Transmission range switch
malfunction or its circuits
open or short.
Step
Action
Yes
No
Summary of Contents for Engine 2002 GRAND VITARA SQ625
Page 5: ......
Page 248: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 107 Fig for Step 4...
Page 274: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 133 Fig and Table for Step 3...
Page 291: ...6 1 150 ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE...
Page 360: ...ENGINE MECHANICAL G16 ENGINE 6A1 69 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Page 489: ...6A2 114 ENGINE MECHANICAL H25 ENGINE...
Page 572: ...ENGINE MECHANICAL J20 ENGINE 6A4 83 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Page 591: ...6A4 102 ENGINE MECHANICAL J20 ENGINE...
Page 598: ...ENGINE COOLING 6B 7...
Page 623: ...6B 32 ENGINE COOLING...
Page 693: ...6E1 62 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Page 697: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE ENGINE AND EMISSION CONTROL SYSTEM DIAGRAM...
Page 743: ...6E2 50 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 814: ...CHARGING SYSTEM 6H 21 Disassembly 70 A and 80 A types...
Page 827: ...6H 34 CHARGING SYSTEM...
Page 833: ...6K 6 EXHAUST SYSTEM...
Page 834: ...Prepared by 1st Ed Dec 2002 Printed in Japan 824...