6-110 ENGINE GENERAL INFORMATION AND DIAGNOSIS (G16/J20 ENGINES)
DTC CONFIRMATION PROCEDURE
1) Connect scan tool to DLC with ignition switch OFF.
2) Turn ON ignition switch and clear DTC, pending DTC and freeze frame data by using scan tool and warm up
engine completely.
3) Run engine at idle speed for 1 min.
4) Check DTC and pending DTC by using scan tool.
TROUBLESHOOTING (P0505)
NOTE:
Check to make sure that the following conditions are satisfied when using this “DTC Confirmation
Procedure”.
• Intake air temp. : –8°C, 18°F or higher
• Engine coolant temp. : –8 – 110°C (18 – 230°F)
• Altitude (barometric pressure) : 2400 m, 8000 ft or less (560 mmHg, 75 kPa or more)
Step
Action
Yes
No
1
Was “Engine Diag. Flow Table” performed?
Go to Step 2.
Go to “Engine Diag. Flow
Table”.
2
Idle Speed Check :
1) Check engine idle speed referring to “Idle
Speed/Idle Air Control Duty Inspection” in
Section 6E1.
Is engine idle speed within specification?
Intermittent trouble or
faulty ECM (PCM).
Check for intermittent
referring to “Intermittent
and Poor Connection” in
Section 0A.
Go to Step 3.
3
IAC Valve Check :
1) Check IAC valve referring to “IAC Valve” in
Section 6E1.
Is check result as specified?
Go to Step 6.
Go to Step 4.
4
IAC Valve Circuit Check :
1) With ignition switch OFF, disconnect ECM
(PCM) couplers.
2) Check for proper connection to IAC valve at
C51-2-3, C51-2-12, C51-2-11 and C51-2-10
terminals.
3) If OK, check resistance between C51-2-3
and C51-2-12, C51-2-10 and C51-2-11.
Is each resistance 70 – 86
Ω?
Go to Step 5.
“LT GRN/BLK”, “PPL/
BLK”, “GRY/BLU” or
“PPL/YEL” wire open or
short.
If wire and connections
are OK, replace IAC
valve.
5
IAC Valve Power Supply Voltage Check :
1) Connect ECM (PCM) couplers.
2) With ignition switch OFF, disconnect coupler
of IAC valve.
3) With ignition switch ON, check voltage
between C29-2 (“BLU/BLK” wire terminal of
IAC valve coupler) and ground, C29-5
(“BLU/BLK” wire terminal of IAC valve cou-
pler) and ground.
Is each voltage 10 – 14 V?
IAC valve or ECM (PCM)
malfunction.
Open “BLU/BLK” wire.
Summary of Contents for Engine 2002 GRAND VITARA SQ625
Page 5: ......
Page 248: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 107 Fig for Step 4...
Page 274: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 133 Fig and Table for Step 3...
Page 291: ...6 1 150 ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE...
Page 360: ...ENGINE MECHANICAL G16 ENGINE 6A1 69 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Page 489: ...6A2 114 ENGINE MECHANICAL H25 ENGINE...
Page 572: ...ENGINE MECHANICAL J20 ENGINE 6A4 83 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Page 591: ...6A4 102 ENGINE MECHANICAL J20 ENGINE...
Page 598: ...ENGINE COOLING 6B 7...
Page 623: ...6B 32 ENGINE COOLING...
Page 693: ...6E1 62 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Page 697: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE ENGINE AND EMISSION CONTROL SYSTEM DIAGRAM...
Page 743: ...6E2 50 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 814: ...CHARGING SYSTEM 6H 21 Disassembly 70 A and 80 A types...
Page 827: ...6H 34 CHARGING SYSTEM...
Page 833: ...6K 6 EXHAUST SYSTEM...
Page 834: ...Prepared by 1st Ed Dec 2002 Printed in Japan 824...